2011年6月20日 星期一

June 14 Lobby set up



The model was finished and every element are movable. We were trying to find the most apporpriate way to build up the space. After discussion, we are going to have time board, rest space and a bar.

2011年6月15日 星期三

2011年6月13日 星期一

2011年6月8日 星期三

June 7 Logo voting



June 7th, every group justified the logo. After the voting, the elements had been decided.

2011年6月6日 星期一

June 2nd Outline set



June 2nd.

We discussed the schedule of the Workshop while the direction was set. Every group raised the details and the steps. Dillon and Jung were guiding us through this part.